Comments

SusanFaux fur vest 49 minutes ago
Here is the pattern: www.craftorator.com/5841-help...
Evelyn​Crochet Beige Jacket 10 hours ago
I love the beige sweater.  Do you have a written p...
EvelynTypes of hats 10 hours ago
Pony tail crochet hat
DarleneTypes of hats 15 hours ago
beanie do you have the patern 
My Fingers FlyGnomes 18 hours ago
Thank you
My Fingers FlyGnomes 18 hours ago
Thank you
Thank you
Thank you
ImmanTypes of hats 20 hours ago
slouchy 

​Knit Melange Green Pullover

Susan
Aug 20, 2021 12:30 AM

You’ll need:

400 (450) 500g of mélange green Carerra Lana Grossa yarn (45% silk, 30% alpaca, 25% merino wool; 140m/50g);

Knitting needles 4,5 and 5,5;

Circular knitting needles 4,5.


Size: S (M) L.


Used Patterns

Rib, knitting needles 4,5: straight and reversed rows: the quantity of sts is multiple 4 + 2 + 2 selvage sts. RS rows: 1 selvage st, * 2 purls, 2 knit sts*; repeat from * to *, 2 purls, 1 selvage st; WS rows: as sts face. Circle rows: the quantity of sts is multiple 4. * 2 knit sts, 2 purls*.

Main pattern, knitting needles 5,5: the quantity of sts is multiple 9 + 2 selvage sts. Work due to the scheme, on which only RS rows are stated, make WS rows as sts face. Repeat the pattern A between selvage sts. Make 1st-6th rows x once, then, repeat 3rd-6th rows.

Pattern for sleeves (of 47 sts), knitting needles 5,5: work in the same way, as the main pattern, but in the following way: 1 selvage st, 9 sts of pattern repeat A, 8 sts of pattern repeat A to arrow A, 11 sts of pattern repeat B, 8 sts of pattern repeat A from arrow B, 9 sts of pattern repeat A, 1 selvage st. For diagonal strips, increase 1 cross st due to the pattern of across thread of yarn after 1 selvage st in every WS row, both sts before the central 11 sts (= pattern repeat B due to the scheme) make together due to the pattern, make both first sts after the central 11 sts together due to the pattern and increase 1 cross st due to the pattern before 1 selvage st.


Stitches control: 17,5 sts x 22 rows = 10 x 10 cm.


Instructions

Back

Cast on 72 (80) 92 sts and make 8 cm of rib. Then, work with the main pattern, increase 11 (12) 9 sts in the 1st row = 83 (92) 101 sts. In 25,5 cm = 56 rows from rib, bind off 2 sts from both sides for arm-holes and 7 x 1 st in every 4th row = 65 (74) 83 sts. In 52 cm = 114 rows from rib, bind off the central 15 (20) 25 sts for neck-hole and finish both sides separately. For smooth rounding, bind off 1 x 4 sts and 1 x 3 sts in every 2nd row from inwards. At the same time, bind off 6 sts from both sides in 52,5 cm = 116 rows from rib for shoulder chamfers and bind off 2 x 6 (7) 8 sts in every 2nd row. Finish your work in 54,5 cm = 120 rows from rib.


Front

Make in the same way, as back, but for deeper neck-hole, bind off the central 7 (12) 17 sts in 44,5 cm = 98 rows from rib and bind off 3 x 2 sts and 5 x 1 st in every 2nd row.


Sleeves

Cast on 32 sts and make 2 cm of rib. Then, work with pattern for sleeves, increase 15 sts in the 1st row = 47 sts. At the same time from rib, increase 7 x 1 st in every 6th row from both sides for sleeve chamfers and 16 x 1 st in every 4th row = 93 sts, include the increased sts in the pattern. In 50 cm = 110 rows from rib, bind off 4 sts from both sides of rib for sleeve caps and 3 x 2 sts, 3 x 3 sts, 3 x 4 sts, 1 x 5 sts in every 2nd row. In 60 cm = 132 rows from rib, bind off the rest 21 sts.


Assembly

Make shoulder seams. Cast on 92 sts along neck-hole with circular knitting needles and make placket with rib. At 2 cm height of placket, bind off all sts as they face. Sew up the sleeves, make side and sleeve seams.

​Knit Melange Green Pullover
​Knit Melange Green Pullover
Like!1
Add to bookmarks
Assign tags
250
Loading...
2 comments
00
Aug 20, 2021 04:33 PM

oh I wish the green sweater was in crochet pattern.

00
Aug 21, 2021 01:50 AM

oh I wish the green sweater was in crochet pattern.

I'll see, maybe, I can find a similar pattern, but for crocheting