Start new topic Forum Latest digest Sign in Create account
Search
CrochetKnittingMenScarvesHatsGlovesSweatersCardigansSocksOther clothingWomenScarvesHatsGlovesShawls and cover upSweatersCardigansSocksSlippersBagsOther clothingChildrenScarvesHatsGlovesSweatersCardigansSocksSlippersBagsOther clothingHomeBlankets and plaidsRugsHome decorationsPetsSchemesOther hand-madeChat

Helping our users. ​Green Knit Dress.

Susan
Susan
Aug 18, 2020 01:37 AM
Helping our users. ​Green Knit Dress.
Helping our users. ​Green Knit Dress.
Helping our users. ​Green Knit Dress.

You’ll need:

500 g of Camtex “Bondi” yarn (100% imported mercerized cotton; 270 m / 100 g) of green color;

Knitting needles 3;

Crochet hook 1.5.

Size: M-L.


Used Patterns

On the spokes: facial loops (faces. P.), Purses loops (from p.), Purses (faces. P. - worn. P., Rn-faces. P.); basic pattern: knit according to the pattern.

Hook: air loops (c. P.), Connecting bollards (comp. Art.), Bollards without nakida (Art. B / n), "pitch".


Stitches control: 25 sts X 34 rows = 10 x 10 cm, main pattern, knitting needles 3.

24 sts x 34 rows = 10 x 10 cm, purl stitch, knitting needles 3.

24 p. X 34 p. = 10 x 10 cm, connected on the needles No. 3 by a purl stitch.


Instructions

Back

Knit bottom up. On the needles 3 green yarn dial 198 sts + 2 chrome. n.

Distribute loops as follows: 1 chrome. p., 10 p. - purl surface, * 28 p. - main pattern, 22 p. - back purse *, repeat from * to * 2 times, 28 p. - main pattern, 10 p. - wrong surface, 1 chrome . n.

Next knit loops and distributed according to the basic circuit pattern.

To narrow the skirt in the 14th row from the start of work, perform a decrease before and after each main pattern, 1 p., Then in each 14th row, 10 times 8 p.

On the needles = 114 p. From the 168th knit according to the scheme main pattern, straight.

For the clearance of the line in the 181st row from the beginning of the work, perform increments on both sides by 2 points, then in each 2nd row 1 time by 2 points, 3 times by 1 point.

On the spokes = 128 points. Added loops knit as follows: * 1 out. n., 1 cross. n persons *, repeat from * to * 2 times, 1 life span.

For the design of the neckline in the 268th row from the start of work, close the average 34 points and on each side in each 2nd row 1 time 4 points, 1 time for 3 p., 1 time for 2 p., 1 time for 1 p.

On the needles = 37 p. In the 277th row from the beginning of the line, arm all the loops close in the same row. The left shoulder to perform similarly.

Before: knit, back.


Assembly

Run side and shoulder seams. Tie the neckline, armored lines around the circle in “striking step” with the help of hook No. 1.5. Row finish with connections

Like!2
625
No comments