CrochetKnittingMenScarvesHatsGlovesSweatersCardigansSocksOther clothingWomenScarvesHatsGlovesShawls and cover upSweatersCardigansSocksSlippersBagsOther clothingChildrenScarvesHatsGlovesSweatersCardigansSocksSlippersBagsOther clothingHomeBlankets and plaidsRugsHome decorationsPetsSchemesOther hand-madeChat
Schemes
Create topic
Transversal Waves Knit Stitch
Knitting Instructions for the Ornament For the ornament, knit the 1st to 4th rows using garter stitch. Row Instructions 5th row: knit 2 stitches from 1 stitch, increasing the quantity of stitches twice; 6th to 18th rows: continue with stockinette stitch; 19th row: knit 2 together, turning to the initial quantity of stitches. Repeating the Pattern Repeat from the 1st to the 19th rows to achieve the desired ornament finish.
Lateral Waves Knit Stitch
Introduction The quantity of stitches (sts) is multiplied by 8 + 2 + 2 selvedge stitches. Knitting Instructions 1st Row 1 selvedge st, 1 knit st, * (8 knit sts, turn, 8 purls on the same sts) twice, 16 knit sts*, 1 knit st, 1 selvedge st; 2nd to 4th Rows Continue with stockinette stitch for these rows. 5th Row 1 selvedge st, 1 knit st, * (8 knit sts, turn, 8 purls on the same sts) twice, 16 knit sts*, 1 knit st, 1 selvedge st; 6th to 8th Rows Again, work in stock...
Relief Rhombs Knit Stitch
The quantity of stitches is multiplied by 12 stitches plus 2 stitches for symmetry and 2 selvedge stitches. Slip the 1st selvedge stitch without knitting and make the last selvedge stitch as purl. Knitting Instructions 1st Row: Knit; 2nd, 4th, 6th, 8th Rows: Purl; Complex Stitch Rows 3rd Row: 1 knit stitch, * transfer 2 stitches to the auxiliary needle behind work, 2 knit stitches, make 2 stitches from the auxiliary needle as knit stitches, 4 knit stitches, transfer 2 stitches to the a...
Asian Cable Knit Stitch
The quantity of sts is multiplied by 6, including 2 selvedge sts. RND 1 : 1st row: 6 knit sts, turn, leave the rest sts without knitting them; RND 2 : 2nd row: 6 purls; Continue work only on these 6 sts with stockinette stitch for 10 rows. RND 11 : 11th row: 6 knit sts, sts from the set-up edge, turn; RND 12 : 12th row: 6 purls, turn, don't knit the rest sts; Continue work only on these 6 sts with stockinette stitch for 10 rows. After that, make 2 rows with stockinette stitch on al...
Fancy Knit Stitch
Introduction The quantity of stitches (sts) is multiplied by 5 stitches. Pattern Repeat Pattern repeat = 12 rows. Knit Instructions Knit according to the scheme, which only states right-side rows. Make wrong-side rows with the description below: Wrong-Side Row Instructions 1st row: * 1 knit st, 3 purls, 1 knit st*; repeat from * to * to end of row; 3rd row: * 1 yarn over, 1 knit st, purl2tog, 1 purl, 1 knit st*; repeat from * to * to end of row; 5th row: * 1 purl, knit2tog with le...
Pine Nuts Knit Stitch
Introduction The quantity of stitches (sts) is multiplied by 4, plus 3 sts for symmetry, and an additional 2 selvedge sts. A total of 17 sts will be sufficient for the sample. Row Instructions 1st Row 3 purls, bead ( 1 knit st, yarn over, 1 knit st, yarn over, 1 knit st from 1 st without tightening )*, 3 purls; 2nd Row * 3 knit sts, 5 sts of bead together purl*, 3 knit sts; 3rd Row knit; 4th Row purl; 5th Row knit; 6th Row purl; 7th Row knit; 8th Row purl.
Hazelnut Knit Stitch
Introduction to Stitch Quantity The quantity of stitches (sts) is calculated as follows: 5 + 4 sts for symmetry + 2 selvedge sts. For the sample, you can cast on 16 sts. Row Instructions 1st Row * 4 purls, 4 sts in 1 st (1 knit st twice, 1 purl)*, 4 purls; 2nd Row * 4 knit sts, 4 purls*, 4 knit sts; 3rd Row * 4 purls, 4 knit sts*, 4 purls; 4th Row * 4 knit sts, 4 purls*, 4 knit sts; 5th Row * 4 purls, purl 4 together*, 4 purls; 6th Row Knit; 7th Row Purl; 8th Row ...
Almond Knit Stitch
Knitting Row Instructions 1st Row : * 5 purls, 1 knit stitch*; repeat from * to *; 2nd Row : Knit stitches above knit stitches, purls above purls; 3rd Row : * 5 purls, 1 knit stitch*; repeat from * to *; 4th Row : Knit stitches above knit stitches, purls above purls; 5th Row : * 5 purls, 1 knit stitch*; repeat from * to *; 6th Row : Knit stitches in knit stitches, purls in purls; 7th Row : * 5 purls, pull the yarn from the 6th row to the level of all the stitches (yarn over, pul...
Beads Knit Border
Introduction The quantity of stitches is multiplied 4 + 1. Bead Technique Bead: (1 knit stitch, yarn over, 1 knit stitch, yarn over, 1 knit stitch) in the next stitch, turn, 5 purls, turn, 5 knit stitches, turn, 5 purls, turn, 5 knit stitches, throw the 2nd stitch on the 1st stitch, after that 3rd stitch on the 1st stitch, 4th stitch on the 1st stitch, 5th stitch on the 1st stitch = 1 stitch. Working the Pattern Work: * 2 knit stitches, bead, 1 knit stitch*; repeat from * to *, finish with 1 kn...
Raspberry Knit Stitch
Knitting Instructions Overview The quantity of stitches is multiplied: 6 sts + 5 sts for symmetry + 2 selvedge sts. Row Instructions 1st Row 1 selvedge st, * 2 purls, (1 knit st, yarn over, 1 knit st, yarn over, 1 knit st) in the next st, 2 purls, 1 knit st through back loop*; repeat from * to * to last 6 sts, 2 purls, (1 knit st, yarn over, 1 knit st, yarn over, 1 knit st) in the next st, 2 purls, 1 selvedge st; 2nd Row 1 selvedge st, * 9 knit sts, 1 purl*; repeat from * to * to the last pat...
Circles Knit Stitch
Understanding the Quantity of Stitches The quantity of stitches is multiplied by 15 plus 2 selvedge stitches. Following the Knitting Scheme Knit according to the scheme, on which all the rows are stated. Starting with Selvedge Stitches Start with 1 selvedge stitch, followed by the pattern repeat, and end with 1 selvedge stitch. Row Repetition Instructions Repeat from the 1st to the 20th rows.
Cables Imitation Knit Stitch
The quantity of stitches (sts) is multiplied as follows: 5 stitches + 2 stitches for the symmetry + 2 selvedge stitches. Knitting Instructions First Row (Wrong-Side) 1 selvedge stitch, * 2 knit stitches, 3 purls *, 2 knit stitches, 1 selvedge stitch; repeat from * to * to the end of the row. Second Row (Right-Side) 1 selvedge stitch, * 2 purls, 2 knit stitches, slip 1 stitch without knitting, yarn behind work *, 2 purls, 1 selvedge stitch; repeat from * to * to the end of the row. Third Row...
Relief Royal Knit Cable
Introduction The quantity of stitches is multiplied by 30 stitches and follows a 12-row repeat. Cast On Instructions For the sample, cast on 42 stitches (30 stitches for the ornament, 10 stitches for the background from both sides, and 2 selvedge stitches). Slip the 1st selvedge stitch as a knit stitch and make the last selvedge stitch a purl. In the further description, selvedge stitches are not included. Row Instructions Initial Rows 1st row: knit; 2nd and all the wrong-side rows: purl; ...
Butterfly Knit Stitch
Knitting Rows Breakdown RND 1 : 1 selvedge st, 5 knit sts, slip 5 sts without knitting them, yarn in front of work (broaching), 1 selvedge st; RND 2 , RND 4 , RND 6 , RND 8 : purl; RND 3 , RND 5 , RND 7 , RND 9 : as 1st row; The Butterfly Stitch Technique RND 10 : make a butterfly - 1 selvedge st, 2 purls, insert right-hand needle behind work, through 5 broachings, catch all of them and transfer to the left-hand knitting needle, purl 5 together, 1 purl, throw the previous st throug...
Moth Knit Stitch
Introduction The quantity of stitches is multiplied by 14 stitches. Row Instructions 1st Row (Wrong Side) 1 selvedge stitch, 4 purls, * treble yarn over (= wind the right-hand needle with working yarn 3 times), 1 purl, treble yarn over, 14 purls *; repeat from * to * to last 5 stitches, 4 purls, 1 selvedge stitch. 2nd Row (Right Side) 1 selvedge stitch, 4 knit stitches, * slip first 3 yarn overs, place this stitch in front of work, 1 knit stitch, slip 2nd yarn over, 14 knit stitches; repeat f...