Topics
Red Crochet T-Shirt
You’ll need: 100g of red yarn (50% cotton, 50% viscose; 375m/75g); Crochet hook 1,75; 3 buttons. Size: 2 years. Instructions Crochet from up to down with sleeve raglan. Measure neck circumference, count the quantity of sts due to the scheme 3, the quantity of squares is about 90. Make chain of the needed length due to the scheme 2. There should be 2 details of front – there should be neck-hole left for placket. Make increase of 5 chain sts of front for placket. Work arou...
Crochet Funny Snowman
You’ll need: Himalaya Dolphin Baby yarn in white color; YarnArt Jeans yarn in orange and black colors; Crochet hooks 2,5 mm and 4 mm; 8 mm safety eyes; Fiberfill; Buttons for decoration; Yarn needles; Scissors. Size: 16 cm Instructions Head and body (one piece) Himalaya Dolphin Baby yarn, 4.00 mm crochet hook. R 1: 6 sc in magic ring [6] R 2: (inc) repeat 6 times [12] R 3: (1 sc, inc) repeat 6 times [18] R 4: (2 sc, inc) repeat 6 times [24] R 5-7: 24...
Knit Basket Rib Pattern
The quantity of sts is multiple 2 + 1. 1st row (RS): knit; 2nd row: purl; 3rd row: *K1, sl 1; rep from * to last st, k1; 4th row: *K1, wyif, sl 1, wyib; rep from * to last st, k1. Repeat 1st-4th rows.
Crochet Kabeli Pattern
1st row (RS): dc in 4th ch from hook and each ch across, do not turn; 2nd row: working from left to right, ch 1, rev sc in front loop of each dc across, sl st to top of tch, do not turn; 3rd row: ch 3 dc back loop in each dc 2 rows below (working in rem loop behind rev sc), do not turn. Repeat 2nd-3rd rows.
Email issue
Is anyone else having an issue with the email? Click on any link or photo and you ONLY get the main pattern. Hope tech support sees this and can help. There are lots of good patterns I want to try!
Crochet Green Pullover with Flowers
You’ll need: 450 (500) 500g of green Supersoft Linie 107 yarn (60% cotton, 40% polyacryl; 130m/50g); Crochet hook 3,5. Size: S (M) L. Used Patterns Half-crochets: start every row with 1 extra chain st. Rib with even sts: 1st rnd: double crochets, replace the 1st double crochet to 3 chain sts and finish the row with 1 slip st in upper chain st increase of the 1st st; 2nd rnd: * 1 front post double crochet, 1 back post double crochet with 1 extra chain st increase*, fi...
Knit Red Pullover
You’ll need: 1000 (1100) 1200g of red Anouk yarn (50% alpaca wool, 50% microfiber; 56m/100g); Straight and circular knitting needles 10. Size: S (M) L. Used Patterns Wavy pattern: the quantity of sts is multiple 18 + 10 (10) 0 + 2 selvage sts. Work due to the scheme, on which both RS and WS rows are stated. Start with 1 selvage st, repeat the pattern x once (once) twice, finish with the first 10 (10) 0 sts of pattern repeat and 1 selvage st. Repeat 1st-4th rows. Garte...
Black Relief Shawl
You’ll need: 125g of chestnut color yarn (70% mohair, 30% silk; 420m/50g); 50g of the same yarn, but in orange-ginger color; 50g of the same yarn, but in orange-coral color; Crochet hook 3,5. Size: M. Used Patterns Main pattern: the quantity of sts is multiple 5 + 2. Work due to the scheme 1. Start with sts before pattern repeat, pattern repeat, 1st-3rd rows x once, then, repeat 2nd-3rd rows. Wavy pattern: the quantity of sts is multiple 20 + 1. Make in the same way,...
Crochet Long Scarf with Tassels
You’ll need: 1 skein of Lion Brand Scarfie yarn (‘Silver/Mint’ pictured) or approx. 312 yds. of a comparable category 5 bulky yarn; Crochet hook 6,5 mm; Yarn needle; Scissors. Size: 71” x 7”. Stitches control: 13 sts x 6 rows = 4" x 4”. Instructions ch 4 Row 1: HDC in the second ch from the hook and HDC across (3). Turn. Row 2: ch 1, 2 HDC in first st, HDC across (4). Turn. Row 3: ch 1, HDC across, 2 HDC in last st (5). Turn. Row 4-17: R...
Knit Ridged Lace Pattern
The quantity of sts is multiple 2. 1st row (RS): K1, *yo, k2tog tbl,* rep from * to last st, k1; 2nd row: P1, *yo, p2tog,* rep from * to last st, p1. Repeat 1st-2nd rows.
Arruga Crochet Pattern
1st row (RS): Dc in 4th ch from hk and each ch across, turn; 2nd row: ch 1, sc in 1st dc, *BPsc in next sc, FPsc in next sc; rep from * across, sc in top of t-ch, turn; 3rd row: ch 3 (counts as dc), dc in each sc across, turn; 4th row: ch 1, sc in 1st dc, *FPsc in next sc, BPsc in next sc; rep from * across, sc in top of t-ch, turn; 5th row: ch 3 (counts as dc), dc in each sc across, turn. Repeat 2nd-5th rows.
Crochet Skirt with Straps
You’ll need: 300g of Adelia Olivia yarn (40% wool, 60% acryl; 250m/100g) in dark-green color; Crochet hook 2,5. Size: M. Stitches control: 18 sts x 16 rows = 10 x 10 cm. Instructions Skirt Gusset Make 22 chain sts with dark-green yarn. 1st row: 1 single crochet in the 3rd chain st, 19 single crochets in the next 19 chain sts (21 sts); For widening of gusset, increase 1st single crochet in the 4th row from both sides, then, bind off 3 x 1 st in every 6t...
Knit Orange Pullover with Big Collar
You’ll need: 400 (450) 500g of mélange orange (11) Lala Berlin Lovely Lana Grossa yarn (52% alpaca, 18% wool, 18% cashmere, 12% polyamide; 90m/50g); 150 (175) 200g of orange (417) Silkhair Pailettes Lana Grossa yarn (61% mohair, 11% silk, 11% merino wool, 17% nylon; 155m/25g); Knitting needles 5 and 6; Circular knitting needles 8; Crochet hook 6. Size: S (M) L. Note: work in 2 threads of Silkhair Paillettes yarn. Used Patterns 2 x 2 rib. Main pattern: t...
Blue Pullover with Brown Stripes
You’ll need: 350 (450)g of denim-blue yarn (66% cotton, 22% polyamide, 12% wool; 145m/50g); 150 (200)g of the same yarn, but in brown color; Crochet hook 4; Knitting needles 4. Size: S (M). Used Patterns Main pattern: the quantity of sts is even in the set-up row. Work due to the scheme 1. Start with sts before pattern repeat, pattern repeat, finish with sts after pattern repeat. Make 1st-3rd rows x once, repeat 2nd-3rd rows all the time. Pattern for sleeves: the qu...