Step-by-Step Knitting Pattern Instructions

Understanding the Stitch Count
The quantity of stitches (sts) is multiplied by 6 sts + 1 st for symmetry + 2 selvedge sts (slip 1 st st, purl the last).
Row Instructions
1st Row
* 1 purl, st with 3 yarn overs, 3 knit sts, st with 3 yarn overs*, 1 purl;
2nd Row
Due to the ornament, knit sts with yarn over in the following way: leave the yarn in front of work, slip the st, drop the yarn overs;
3rd Row
* 1 purl, re-slip st (leave the yarn behind work), 3 knit sts, re-slip st (leave the yarn behind work)*, 1 purl;
4th Row
Knit due to the ornament. Re-slip the drawn sts (leave the yarn in front of work);
5th Row
* 1 purl, slip the drawn st from the knitting needle and leave it in front of work, then re-slip to the right-hand needle, don't knit the next 3 sts, slip the next drawn st from the knitting needle. Return the sts to the left knitting needle in the following way - 1st drawn st, 3 sts slipped from the right-hand needle, then put on the last drawn st, all knit sts*, 1 purl;
6th Row
Knit due to the ornament.
Repeating the Pattern
Then repeat from the 1st to the 6th rows.